Position >  > English > Projec Case >

Project Case

Yangtze River

 
Coastal Pharmaceuticals Water Injection and Solid Workshop BMS/EMS System
Process description: Such projects begin with the selection of field instruments and valves, including the design and installation of cable trays, as well as the calibration and on-site installation of instruments and valves. The main challenges lie in installation progress management, HSE compliance, confirmation of instrument and valve installation (IQ) required for GMP validation, and energy management reporting.